BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
BioThane®  BETA SUPER HEAVY DUTY Dog Lead
In Dog We Trust

BioThane® BETA SUPER HEAVY DUTY Dog Lead

Regular price $33.00 $0.00 Unit price per
Shipping calculated at checkout.

 SUPER HEAVY DUTY LEADS - 

GENUINE BIOTHANE WEBBING

Width - 19mm 

Lengths 1, 2 and 3 meters.

AUSTRALIAN HAND MADE by BD - turn around time 2 weeks

Lead options -  (please be aware that slip leads should be short and controlled. I only make slip leads in one meter lengths to ensure the correct use of a slip lead. Please ensure that you are familiar with the tool, and have implemented safety and training techniques required to use this type of training tool safely and humanely.

Genuine Biothane is far more durable than any materials available on the market, including leather and rope. It is able to be wiped clean, does not degrade, get stinky, snap or stretch out.

 I ONLY USE HEAVY DUTY, HIGH QUALITY HARDWARE AND FITTINGS.

There's no point building a tool with the strongest of materials when your clasps, screws and rings are sub standard.

 


 

 

 

 

 

 




Share this Product